Four Seasons Hotel


Hydro Insulation and the concrete rehabilitation of the Milanese Wall.
The concrete rehabilitation was done 6.5 meters below water level of the Vltava River. Sealing the working joints in the foundation of the Milanese walls was done using the water insulation crystallization H-Krystal and fast case hardening mixtures Hydraplug A and B.