With you for more than 20 years
+420 605 241 162, +420 603 416 763

Střeleč Eximos - DOOR tanks


The largest fulfillment of H- Krystal structural rehabilitation of cement was fulfilled in the summer of 2001, which consisted of namely tightening for the settling reservoir DOOR in Střelči u Jičina for the firm Eximos.
A seal was applied to two reservoirs with an average width of 31m and a height of 6m. They were already cracking and contracting leaks 25 years ago in the time of manufacture. When the concrete was around 15 years old it also became corrupted by freezing cycles. The sealing was done using Hydraplugs and crystallization H - Krystal, using expansionary weather sealant in the dilation tears. For further details there are photographs available.